Articulated buses in London: The routes, Incidents & Withdrawal

arriva_london

Arriva London Mercedes-Benz Citaro O530G on route 38 at the intersection of Tottenham Court Road& Shaftesbury Avenue in July 2008

Arriva London Mercedes-Benz Citaro O530G on route 73 at Oxford Circus in June 2006

First London Mercedes-Benz CitaroO530G on route 18 at Euston in June 2009

Stagecoach London Mercedes-Benz Citaro O530G on route 453 onWhitehall in January 2005

London General’s Red Arrow articulated bus fleet at Waterloo garage

Articulated buses, popularly called “bendy buses,” were introduced to London in October 2001 when six Wright Eclipse Fusion bodied Volvo B7LAs were hired from First Hampshire & Dorset for a trial on route 207 between Shepherds Bush and Uxbridge.

In June 2002 new Mercedes-Benz Citaro O530Gs were introduced on Red Arrow commuter services 507 and 521. While articulated bus operation had been standard in several other countries for over 20 years, their use in the United Kingdom had been limited with their introduction in London gaining a lot of press attention. They were later introduced on routes 12, 18, 25, 29, 38, 73, 149, 207, 436 and 453.

During the 2008 Mayoral campaign, Boris Johnson pledged to withdraw articulated buses on the grounds that they were unsuitable for London, and to introduce a modern version of the AEC Routemaster. Withdrawals began in July 2009, when articulated buses on routes 38, 507 and 521 were replaced with conventional single and double decker buses, and a prototype for the New Routemaster was promised to be on the streets by 2012. The last articulated buses were withdrawn in December 2011.

Background

Articulated buses were introduced on several high-capacity routes in the 2000s, coinciding with withdrawal from passenger service of the AEC Routemaster. The Routemasters, involving a step upwards and poor accessibility did not conform to the Disability Discrimination Act 1995. There was also the risk of litigation over accidents involving the Routemaster’s rear open platform.

Articulated buses with multiple doors and simultaneous boarding arrangements were capable of loading passengers in less time than conventional double decker buses and Routemasters. They had a much higher passenger capacity, being able to carry over 140 people per vehicle compared to 77 in a Routemaster, although with far fewer seats.

Articulated buses took up more road space per vehicle (18 metres compared to 9.1 metres for a Routemaster and 10 metres for a double decker), although in terms of road surface used per passenger, there was little difference between double decker buses (which stack passengers vertically on two floors) and articulated buses – 11.8 cm road surface length per Routemaster passenger against 12.8 cm per articulated bus passenger: 8.7% more.

The increased vehicle size meant they were more likely to block junctions and cause difficulties for other road users. Press cove:rage regarding cyclists and motorcyclists was generally negative due to the reduced viewpoint of the driver and greater likelihood of cyclists to enter blind spots.

The routes converted to articulated bus operation were:

Route Commenced Ceased Operator Replaced by
12 6 November 2004 4 November 2011 London Central double decker buses
18 November 2003 12 November 2010 First London double decker buses
25 26 June 2004 24 June 2011 East London double decker buses
29 14 January 2006 25 November 2011 Arriva London double decker buses
38 29 October 2005 14 November 2009 Arriva London double decker buses
73 4 September 2004 2 September 2011 Arriva London double decker buses
149 24 April 2004 15 October 2010 Arriva London double decker buses
207 9 April 2005 9 December 2011 First London double decker buses
436 8 February 2003 10 November 2011 London Central double decker buses
453 15 March 2003 23 September 2011 Selkent
London General (1)
double decker buses
507 2 June 2002 July 2009 London General single decker buses
521 2 June 2002 September 2009 London General single decker buses

(1) Route 453 transferred from Selkent to London General on 16 February 2008 after tender renewal

Incidents

Fires

During the initial stages of deployment of the articulated buses, between December 2003 and March 2004 there were three similar fires on the new Mercedes-Benz Citaro buses, causing concern over the possibility of an in-built risk to the public. In one incident, a bus caught fire on its delivery route to its operator. The fires caused the temporary withdrawal and modification of the entire fleet of 130 buses.

The buses were brought back into service after engineers replaced and modified problematic pipework in the bus engines. A later fire was ruled out as unconnected. The problem resurfaced with ex Arriva London buses in Malta in August 2013.

Increased fare evasion

The introduction of articulated buses increased fare evasion as passengers were able to enter through any door, leading to the buses becoming known to Londoners as “The Free Bus”. On other UK buses (including articulated buses outside London), entry is only permitted via the front entrance, which is monitored by the driver and thus discourages evasion. As a result, Transport for London recruited an extra 150 Revenue Protection Inspectors to police revenue collection. In 2006 it was reported that conventional buses (i.e. single and double-deckers) accounted for £3,636 of fare evasion in a year, compared to articulated vehicles – with at least almost double the passenger capacity – at £6,333 per year.

Campaign issue

In September 2007, Boris Johnson, the Conservative Party candidate for the 2008 Mayor of London elections, said that his first act as mayor of London would be to scrap bendy buses and replace them with a “modern-day Routemaster” with an open rear platform and a conductor.

Withdrawal

Withdrawn Stagecoach London Mercedes-Benz Citaro O530Gs at West Ham garage in June 2011

In August 2008, following the election of Boris Johnson as Mayor of London, it was announced the bendy buses would be withdrawn as their five-year operating contracts expired, starting from May 2009, and completed by 2013 (or 2015 depending on contract extensions). This was brought forward to December 2011.

Research by London TravelWatch indicated that such a withdrawal could prove costly to TfL. A study conducted in September 2008 found that replacing articulated vehicles on routes 38, 507, and 521, whilst maintaining overall route capacity, would cost an additional £12.6m per annum, due to the additional vehicles necessitated. Additional cost was also incurred with the need to pay early termination fees on leases.

The first articulated vehicles to be replaced were on 507 and 521, which were replaced by twelve-metre long single-deck buses in July and September 2009 respectively. Articulated buses were replaced by double-deckers on 38 in November 2009. Route 207 was the last route to operate articulated buses on 10 December 2011.

Withdrawn buses have found their way to other parts of the UK. Some went to Arriva Midlands in Leicester and Arriva North West in Liverpool. Go-Ahead Group transferred some to their Brighton & Hove, Go North East, Southern Vectis and Wilts & Dorset operations. Some were sold to CT Plus, Bristol and McGill’s Bus Services, Glasgow. Arriva also exported 68 to Malta in 2011 for use by its Arriva in Malta subsidiary.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s